Identity
AQLARA Ciclo Integral del Agua S.A.
| Year | Amount | Distribution |
|---|---|---|
| 2026* | €14.1M | |
| 2025 | €20.6M | |
| 2024 | €15.6M | |
| 2023 | €6.8M | |
| 2022 | €9.2M | |
| 2021 | €16.8M | |
| 2020 | €1.1M | |
| 2019 | €1.3M | |
| 2018 | €1.3M | |
| 2017 | €0.1M |
In figures
Volume
Between 2017 and 2026 it won 366 contracts worth €87.0M on its own, with 192 buyers. Its joint-venture (UTE) contract is shown separately.
Price
In 2024–2026 its median discount was 17.6%; the middle half of its discounts between 8.1% and 25.5% (115 comparable awards).
Competition
Since 2024, 72% of its comparable value was won with a discount and against other bidders. It was the only bidder in 21% of its contracts (2017–2026).
Renewals
45 contracts (€17.1M) come up for tender again in the next 24 months.
A UTE is a temporary joint venture: the contract is awarded to the UTE and each partner's share is not published. That is why these contracts are not added to AQLARA Ciclo Integral del Agua S.A.'s total, and under «Show UTEs» the amounts are the full value of each contract (100%), not AQLARA Ciclo Integral del Agua S.A.'s share.
Data up to 31 October 2026 · updated on 12 November 2026 · Source: official data, national and regional coverage
| UTE partners | Contracts | Total value (100 %) |
|---|
Its discounts
The discount at which it wins contested contracts, year by year.
2024–2026: median 17.6% · middle half between 8.1% and 25.5% · 115 awards
2018–2023: median 16.8% (113 awards) · 2024–2026: median 17.6% (115 awards).
2018–2026: median 17.0% · middle half between 8.2% and 25.3% · 228 awards
Discount on the tender budget, excluding VAT, on awards above the minor-contract threshold · Source: official data, national and regional coverage. Methodology →
Where it wins, and at what discount
In the report · these discounts, one by one
Each dot on the chart is an award. The report lists them all and groups them by buyer and by sector, next to the discounts of other companies with the same buyers.
By sector
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
CPV 452
79 contracts · €26.1M
Distribución de agua y servicios conexos
CPV 651
21 contracts · €11.0M
Servicios de alcantarillado
CPV 904
14 contracts · €5.03M
Instrumentos de medida o control de características físicas
CPV 384
20 contracts · €2.28M
By buyer · 2024–2026
Presidencia de la Diputación Provincial de Alicante
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
5 contracts · €1.42M
Full list: date, buyer, amount, budget, discount, bidders and a link to the official publication.
26 awards at the tender price, left out of the discounts.
How it wins
Whether it wins with or without competition.
72% of the comparable value since 2024 (€28.7M of €40.1M) was won with a discount and against other bidders. €11.2M (28%) was awarded with a discount and without other bidders.
Comparable: 158 awards with a published budget and bidder count (€40.1M of €50.3M awarded since 2024). Percentages of value; the figure next to «bidders» is the number of awards. Source: official data, national and regional coverage.
Between 2017 and 2026, 64.8% of the value was awarded through open procedure (35.0% of contracts); followed by Simplified open (34.3%) and Negotiated without publicity (0.8%).
Upcoming tenders and main buyers
When its contracts come back and who it sells to.
In the next 24 months 45 of its contracts come up for tender again, worth €17.1M.
| Expected end | Buyer | Value |
|---|---|---|
| 2026 | Consorcio de Gestión de Servicios Medioambientales de Badajoz | €97.4k |
| 2026 | Alcaldía del Ayuntamiento de Onis | €73.9k |
| 2026 | Alcaldía del Ayuntamiento de Biescas | €15.0k |
| 2026 | Alcaldía del Ayuntamiento de Biescas | €8.84k |
| 2026 | Alcaldía del Ayuntamiento de Biescas | €720 |
and 40 more in the next 24 months · the report includes them all
Expected end year from the published duration (no extensions). The report includes the month and the discount it won each one at.
| Buyer | Contracts | Value, € | Period |
|---|---|---|---|
| Sociedad Pública de Infraestructuras y Medio Ambiente de Castilla y León S.A. | 2 | 7.6 M | 2025–2026 |
| Pleno del Ayuntamiento de Almodóvar del Campo | 2 | 6.8 M | 2021–2022 |
| Ajuntament de Guissona | 3 | 6.6 M | 2021–2025 |
| Pleno de Ayuntamiento de Dueñas | 1 | 5.5 M | 2024 |
| Consorcio para el Abastecimiento de Agua y Saneamiento en el Principado de Asturias | 3 | 5.1 M | 2021–2026 |
and 187 more buyers
Between 2017 and 2026, 58.9% of the value it won on its own is in Construction work (CPV 45, 194 contracts); followed by Public utilities (CPV 65), with 21.4%.
Recent awards
The evidence behind every insight in the report.
| Date | Contract | Buyer | Bidders | Value |
|---|---|---|---|---|
| 19/09/2026 | Se pretende acometer las actuaciones para la mejora de la eficiencia energética en el uso del agua … | Alcaldia de la Entidad Local Menor de Gavín | 3 | €18.9k |
| 28/07/2026 | Nuevo sondeo y equipamiento en Cañada Palletas para abastecimiento de agua potable en Requena | Junta de Gobierno Local del Ayuntamiento de Requena | 4 | €226k |
| 26/06/2026 | Construcción Estación Depuradora de Aguas Residuales en Arasan | Alcaldía del Ayuntamiento de Bisaurri | 1 | €124k |
| 03/06/2026 | Modernización red de control del agua en el sistema de abastecimiento. Digitalización ciclo del agua | Alcalde del Ayuntamiento de Brea de Aragón | 5 | €133k |
| 08/04/2026 | Obra de renovación del parque de contadores e implantación de red fija en Callosa d’En Sarrià. Reco… | Presidencia de la Diputación Provincial de Alicante | 4 | €87.1k |