Identity
Ferrovial Construcción, S.A.
A28019206| Year | Distribution | Amount (€M) |
|---|---|---|
| 2026* | 117.9 | |
| 2025 | 166.7 | |
| 2024 | 221.2 | |
| 2023 | 256.6 | |
| 2022 | 213.6 | |
| 2021 | 182.5 | |
| 2020 | 46.3 | |
| 2019 | 227.9 | |
| 2018 | 63.6 | |
| 2017 | 23.4 | |
| 2016 | 8.2 | |
| Total 2016–2026 | 1,528 | |
In figures
Volume
Between 2016 and 2026 it won 662 contracts worth €1,528M on its own, with 150 buyers. Its 117 joint-venture (UTE) contracts are shown separately.
Price
In 2024–2026 its median discount was 12.6%; the middle half of its discounts between 6.3% and 20.0% (79 comparable awards).
Competition
Since 2024, 97% of its comparable value was won with a discount and against other bidders. It was the only bidder in 53% of its contracts (2016–2026).
Renewals
27 contracts (€224M) come up for tender again in the next 24 months.
A UTE is a temporary joint venture: the contract is awarded to the UTE and each partner's share is not published. That is why these contracts are not added to Ferrovial Construcción, S.A.'s total, and under «Show UTEs» the amounts are the full value of each contract (100%), not Ferrovial Construcción, S.A.'s share.
Data up to 31 October 2026 · updated on 12 November 2026 · Source: PLACSP and PSCP
| UTE partners | Contracts | Total value (100 %) |
|---|
Pricing strategy
The discount at which it wins contested contracts, year by year.
2024–2026: median 12.6% · middle half between 6.3% and 20.0% · 79 awards
Over the whole period (2016–2026) its median discount was 18.0%; since 2024 it wins with smaller discounts.
2016–2026: median 18.0% · middle half between 10.2% and 26.8% · 284 awards
Discount on the tender budget, excluding VAT, on awards above the minor-contract threshold · Source: PLACSP and PSCP · Methodology →
Where it wins, and at what discount
In the report · these discounts, one by one
Each dot on the chart is an award. The report lists them all and groups them by buyer and by sector, next to the discounts of other companies with the same buyers.
By sector
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
CPV 452
75 contracts · €419M
By buyer · 2024–2026
Dirección General de Carreteras
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
4 contracts · €94.5M
Aena. Dirección de Contratación
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
9 contracts · €72.0M
ADIF -Consejo de Administración
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
3 contracts · €28.6M
Área de Gobierno de Obras y Equipamientos
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
1 contract · €10.3M
Full list: date, buyer, amount, budget, discount, bidders and a link to the official publication.
5 awards at the tender price, left out of the discounts.
How it wins
Whether it wins with or without competition, and where you can compete.
97% of the comparable value since 2024 (€384M of €396M) was won with a discount and against other bidders. Only €11.2M (3%) was awarded with a discount and without rivals.
Comparable: 89 awards with a published budget and bidder count (€396M of €506M awarded since 2024). Percentages of value; the figure next to «bidders» is the number of awards. Source: PLACSP and PSCP.
Between 2016 and 2026, 75.2% of the value was awarded through open procedure (58.2% of contracts); followed by Negotiated with publicity (13.6%) and Based on a framework agreement (5.8%).
Upcoming tenders and main buyers
When its contracts return to tender and who it sells to, so you can position yourself early.
In the next 24 months 27 of its contracts come up for tender again, worth €224M.
| Expected end | Buyer | Value |
|---|---|---|
| 2026 | ADIF Alta Velocidad - Consejo de Administración | €48.6M |
| 2026 | ADIF Alta Velocidad - Presidencia | €4.18M |
| 2027 | Jefatura de Intendencia de Asuntos Económicos Oeste | €15.7M |
| 2027 | Pleno del Ayuntamiento de Güímar | €5.21M |
| 2027 | Autoridad Portuaria de Gijón | €2.48M |
and 22 more in the next 24 months · the report includes them all
Expected end year from the published duration (no extensions). The report includes the month and the discount it won each one at.
| Buyer | Contracts | Value, € | Period |
|---|---|---|---|
| Aena. Dirección de Contratación | 40 | 247 M | 2018–2026 |
| ADIF Alta Velocidad - Consejo de Administración | 12 | 189 M | 2018–2025 |
| ADIF -Consejo de Administración | 20 | 175 M | 2018–2026 |
| Área de Gobierno de Obras y Equipamientos | 284 | 174 M | 2018–2026 |
| Dirección General de Carreteras | 8 | 62 M | 2018–2025 |
and 145 more buyers
Between 2016 and 2026, 97.2% of the value it won on its own is in Construction work (CPV 45, 601 contracts); followed by Agricultural services (CPV 77), with 1.2%.
Recent awards
The evidence behind every insight in the report.
| Date | Contract | Buyer | Bidders | Value |
|---|---|---|---|---|
| 18/09/2026 | Actuaciones previas en la Escuela Infantil Tarabilla, C/ Gandhi, 14. Distrito de Ciudad Lineal. | Área de Gobierno de Obras y Equipamientos | 1 | €17.1k |
| 29/07/2026 | IFS Obras de reforma en el itinerario de evacuación exterior en el Centro de Día y Centro de Servic… | Área de Gobierno de Obras y Equipamientos | 1 | €132k |
| 22/07/2026 | Obras de conservación y mantenimiento en CEIP Lepanto (Subsanación ITE) | Distrito de Moncloa-Aravaca | 1 | €462k |
| 10/07/2026 | Obras de reparación y acondicionamiento en la Escuela Municipal de Música EL CAPRICHO (C5-26-1) | Distrito de Barajas | 1 | €32.9k |
| 07/07/2026 | SP24-00400 Lote 1. Contrato Basado 5. Obras para el refuerzo de la instalación de climatización en … | Madrid Destino Cultura Turismo y Negocio, S.A. | 1 | €404k |