Identity
Compañia General de Construcción Abaldo, S.A.
| Year | Amount | Distribution |
|---|---|---|
| 2026* | €44.5M | |
| 2025 | €25.4M | |
| 2024 | €16.4M | |
| 2023 | €11.2M | |
| 2022 | €11.8M | |
| 2021 | €5.2M | |
| 2020 | €32.1M | |
| 2019 | €58.5M | |
| 2018 | €15.6M | |
| 2017 | €0.2M | |
| 2016 | €1.1M |
In figures
Volume
Between 2016 and 2026 it won 86 contracts worth €222M on its own, with 39 buyers. Its 10 joint-venture (UTE) contracts are shown separately.
Price
In 2024–2026 its median discount was 11.0%; the middle half of its discounts between 7.0% and 13.3% (15 comparable awards).
Competition
Since 2024, 57% of its comparable value was won with a discount and against other bidders. It was the only bidder in 8% of its contracts (2016–2026).
Renewals
9 contracts (€35.7M) come up for tender again in the next 24 months.
A UTE is a temporary joint venture: the contract is awarded to the UTE and each partner's share is not published. That is why these contracts are not added to Compañia General de Construcción Abaldo, S.A.'s total, and under «Show UTEs» the amounts are the full value of each contract (100%), not Compañia General de Construcción Abaldo, S.A.'s share.
Data up to 31 October 2026 · updated on 12 November 2026 · Source: official data, national and regional coverage
| UTE partners | Contracts | Total value (100 %) |
|---|
Its discounts
The discount at which it wins contested contracts, year by year.
2024–2026: median 11.0% · middle half between 7.0% and 13.3% · 15 awards
2016–2023: median 21.0% (57 awards) · 2024–2026: median 11.0% (15 awards).
2016–2026: median 14.6% · middle half between 9.9% and 24.9% · 72 awards
Discount on the tender budget, excluding VAT, on awards above the minor-contract threshold · Source: official data, national and regional coverage. Methodology →
Where it wins, and at what discount
In the report · these discounts, one by one
Each dot on the chart is an award. The report lists them all and groups them by buyer and by sector, next to the discounts of other companies with the same buyers.
By sector
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
CPV 452
22 contracts · €84.1M
Trabajos de preparación del terreno
CPV 451
2 contracts · €1.33M
By buyer · 2024–2026
Dirección General de Carreteras
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
4 contracts · €20.3M
Aena. Consejo de Administración
Trabajos generales de construcción de inmuebles y obras de ingeniería civil
2 contracts · €17.0M
Full list: date, buyer, amount, budget, discount, bidders and a link to the official publication.
2 awards at the tender price, left out of the discounts.
How it wins
Whether it wins with or without competition.
57% of the comparable value since 2024 (€43.6M of €76.9M) was won with a discount and against other bidders. €33.4M (43%) was awarded with a discount and without other bidders.
Comparable: 20 awards with a published budget and bidder count (€76.9M of €86.3M awarded since 2024). Percentages of value; the figure next to «bidders» is the number of awards. Source: official data, national and regional coverage.
Between 2016 and 2026, 70.0% of the value was awarded through open procedure (57.0% of contracts); followed by Negotiated with publicity (15.7%) and Simplified open (10.0%).
Upcoming tenders and main buyers
When its contracts come back and who it sells to.
In the next 24 months 9 of its contracts come up for tender again, worth €35.7M.
| Expected end | Buyer | Value |
|---|---|---|
| 2026 | Junta de Gobierno del Ayuntamiento de Pozuelo de Alarcón | — |
| 2027 | Dirección General de Carreteras | €6.45M |
| 2027 | Alcaldia del Ayuntamiento de Mogán | €2.90M |
| 2027 | Presidencia del Cabildo Insular de Lanzarote | €1.85M |
| 2027 | Presidencia de la Autoridad Portuaria de la Bahía de Algeciras | €1.74M |
and 4 more in the next 24 months · the report includes them all
Expected end year from the published duration (no extensions). The report includes the month and the discount it won each one at.
| Buyer | Contracts | Value, € | Period |
|---|---|---|---|
| Aena. Dirección de Contratación | 29 | 65 M | 2018–2026 |
| Dirección General de Carreteras | 7 | 63 M | 2019–2025 |
| Consejería Delegada de GESTUR Canarias, S.A. | 1 | 27 M | 2026 |
| Consejo de Gobierno Insular del Cabildo Insular de Tenerife | 2 | 10 M | 2019–2020 |
| Área de Gobierno de Planificación, Desarrollo Urbano y Vivienda, Limpieza, Vías y Obras y Alumbrado del Ayuntamiento de Las Palmas de Gran Canaria | 6 | 9.6 M | 2020–2026 |
and 34 more buyers
Between 2016 and 2026, 100.0% of the value it won on its own is in Construction work (CPV 45, 86 contracts).
Recent awards
The evidence behind every insight in the report.
| Date | Contract | Buyer | Bidders | Value |
|---|---|---|---|---|
| 20/11/2025 | Proyecto denominado “Urbanización de avenida de La Constitución” (Tramo 1), en el T.M. de Tazacorte… | Miembros Corporativos titulares de Áreas del Cabildo Insular de la Palma | 1 | €933k |
| 23/10/2025 | Renovación de la tubería de impulsión de la Ebar Casino T.M. Arrecife | Presidencia del Consorcio del Agua de Lanzarote | 3 | €64.8k |
| 09/09/2025 | Mejora en red de distribución de agua potable en Muñique | Presidencia del Consorcio del Agua de Lanzarote | 3 | €212k |
| 12/08/2025 | Urbanización Plan Parcial Reposición de Las Rehoyas. Zonas verdes, aparcamiento y acceso a parcela … | Área de Gobierno de Planificación, Desarrollo Urbano y Vivienda, Limpieza, Vías y Obras y Alumbrado del Ayuntamiento de Las Palmas de Gran Canaria | 1 | €818k |
| 11/06/2025 | Sustitución de dos tubos de acero corrugado (ARMCO) situados en los PP.KK. 238+380 y 238+946 de la … | Secretaría de Estado de Infraestructuras, Transporte y Vivienda - Demarcación de Carreteras del Estado en Castilla-La Mancha | 5 | €814k |